Civil works of the hydroelectric plant located on the slopes of the Misti volcano, in the Andes Mountains, with an installed capacity of 135 MW, with three 45 MW turbines. The hydroelectric plant is designed to meet the energy needs of the city of Arequipa and the Cerro Verde Mineiro Complex, practically underground, from the Boqueirão to the Machine House.
País
Área de atuação(Segmento)
Thumb
Localização
Rio Chile/Arequipa
Status
Subcategoria
Galeria
Thumb
https://www.oec-eng.com/api/sites/default/files/2018-09/charcani-v-2_4.jpg
Tipo
imagem
Site
OEC