Guaratuba Bridge

The bridge will connect the cities of Guaratuba and Matinhos, on the state's coast, 130 km from the capital Curitiba. It is the result of a R$ 386.9 million investment by the Government of Paraná, through the Department of Roads and Highways (DER/PR), an agency linked to the State Secretariat of Infrastructure and Logistics. The work is being carried out by the Nova Ponte Consortium, formed by Odebrecht Engineering & Construction, Carioca Engineering, and Goetze Lobato Engineering.

Santa Cruz Thermal Power Plant

Closing of the Combined Cycle at UTE Santa Cruz using existing gas turbogenerators, of 175 MW each. This equipment has been operating in open cycle on natural gas since the beginning of 2012, a condition that will be maintained until the cycle is closed, which includes the supply of two new heat recovery boilers, a new steam turbine, and new mechanical and electrical auxiliary systems. With the inclusion of new equipment and systems the final power obtained should be 507 MW net.