Civil works and infrastructure of the hydroelectric plant with 520 MW of power (4 x 130 MW), comprising construction of a dam with 110 m of height and 1,470 m of length, which forms a lake of 170 km², road of 60 km of extension, residential village with 255 thousand m² of area, airport runway with extension of 2 thousand meters and transmission line of 30 kV, with 60 km of extension, among other services.
País
Área de atuação(Segmento)
Thumb
Localização
Capanda
Status
Subcategoria
Galeria
Thumb
https://www.oec-eng.com/api/sites/default/files/2018-09/uhe-capanda-angola_4.jpg
Tipo
imagem
Site
OEC