Laúca Hydroelectric Power Plant

Civil works, supply, assembly and commissioning of the electromechanical equipment of the largest Angolan hydroelectric complex, comprising a reservoir with 188 km² and a main plant with six turbines, totaling an installed capacity of 2,073 MW, enough to supply a city of 8 million inhabitants. Expansion of five substations and construction of four new ones.

Capanda Hydroelectric Plant

Civil works and infrastructure of the hydroelectric plant with 520 MW of power (4 x 130 MW), comprising construction of a dam with 110 m of height and 1,470 m of length, which forms a lake of 170 km², road of 60 km of extension, residential village with 255 thousand m² of area, airport runway with extension of 2 thousand meters and transmission line of 30 kV, with 60 km of extension, among other services.