Civil works, supply, assembly and commissioning of the electromechanical equipment of the largest Angolan hydroelectric complex, comprising a reservoir with 188 km² and a main plant with six turbines, totaling an installed capacity of 2,073 MW, enough to supply a city of 8 million inhabitants. Expansion of five substations and construction of four new ones.

País
Área de atuação(Segmento)
Thumb
Localização
Rio Kwanza – Malanje
Subcategoria
Galeria
Thumb
https://www.oec-eng.com/api/sites/default/files/2023-07/aproveitamento-hidreletrico-de-lauca-thumb_0.jpg
Tipo
imagem
Site
OEC