The project will replace the baggage screening system (Baggage Handling System, BHS) of the South Terminal and the installation of an automated system at the BHS of the Central Terminal, including external baggage handling systems, mechanical modifications, a 5.5 thousand m² extension of the current terminal building and a corridor located after the security procedures connecting Terminals G and H.

Área de atuação(Segmento)
Thumb
Localização
Miami / FL
Subcategoria
Galeria
Thumb
https://www.oec-eng.com/api/sites/default/files/2021-08/bagagens-efeito2_1.png
Tipo
imagem
Site
OEC